Mo-99/Tc-99m Generator Re-Elution Yield Estimator
| Activity Eluted | Time of Elution | Time of Re-elution | Estimated Re-elution Yield |
|---|---|---|---|
Note: The estimated yield is made based on the assumption that the re-elution volume is the same as the previous one.
| Activity Eluted | Time of Elution | Time of Re-elution | Estimated Re-elution Yield |
|---|---|---|---|
Note: The estimated yield is made based on the assumption that the re-elution volume is the same as the previous one.