Mo-99/Tc-99m Generator Elution Yield Estimator
Day | Week 1 | Day | Week 2 |
---|
Note: The estimated yield may be overestimated in Week 2 as Moly breakthrough was not considered in the calculation.
Day | Week 1 | Day | Week 2 |
---|
Note: The estimated yield may be overestimated in Week 2 as Moly breakthrough was not considered in the calculation.